How to avoid laitance on concrete blocks?

After using a primary on concrete we did it pull and push over tests

Always with bad results - cement comes out (laitance problems)

The concrete mix design its adequate (maybe not the water amount)

user-image
Question ajoutée par jorge guerra , Rail Track Principal Engineer , Sncf
Date de publication: 2015/07/05
ismail ünlükara
par ismail ünlükara , Construction Manager , Sys Construction

It is better to check the mix design. 

--Check the water content, decrease

--Check sand/gravel ratio, decrease the fine sand

Keith Gregory Wright
par Keith Gregory Wright , Program Director , DynCorp International

If you are experiencing excessive laitence my first concern is mix design, the shape and grading of stone and sand will influence the potential for laitence. Excess bleeding could be a result of poor grading and w/c ratios. 

Sunil K
par Sunil K , Assistant Engineer , Ajmera Realty and Infra (I) Ltd.

Proper mixing and good finishing.

suhaib usmani
par suhaib usmani , Senior QA/QC Engineer , Qatar Building Company

after how many days are you testing? let concrete achieve min70% of its strength..  laitance is on concrete surface.. and can be control by good finishing

By using Vibrators , and some chemical admixtures .  

 