Communiquez avec les autres et partagez vos connaissances professionnelles

Inscrivez-vous ou connectez-vous pour rejoindre votre communauté professionnelle.

Suivre

Gantt charts were employed Hoover Dam and Interstate highway system and other achivements in the start of 20th century

user-image
Question ajoutée par Utilisateur supprimé
Date de publication: 2015/03/27
Ali Mohamed Ahmed
par Ali Mohamed Ahmed , site engineering , شركة مقاولات

I agree with Mr. Ayoub answer ... thank you

Yes, I agree with this statement, this illustrate the powerful of using GANTT to organize the project schedule activities by illustrate the start and finish dates of the terminal elements and summary elements of these activities.

Wolf Klaas Kinsbergen
par Wolf Klaas Kinsbergen , Managing Director, Designer , ingenieursbureau KB International NV

I agree, I believe HL Gantt was his time way, way ahead

Vinod Jetley
par Vinod Jetley , Assistant General Manager , State Bank of India

A Gantt chart is a type of bar chart, first developed by Karol Adamiecki in1896, and independently by Henry Gantt in the1910s, that illustrates a project schedule. Gantt charts illustrate the start and finish dates of the terminal elements and summary elements of a project. Terminal elements and summary elements comprise the work breakdown structure of the project. Modern Gantt charts also show the dependency (i.e., precedence network) relationships between activities.

ماحي عابد
par ماحي عابد , Civil engineer , Technical building control

I agree with the previous answers

Muhammad Khalil
par Muhammad Khalil , Chief Engineer (Civil) , Water and Sanitation Services Mardan

agreed with the answer of Mr. vinod jiltley

Elke Woofter
par Elke Woofter , Project Assistant , American Technical Associates

Yes, I agree as well and several references were made to the Gantt chart  and Hoover Dam

www.gantt-chart.biz/tag/hoover-dam

…  schedule and monitor large construction projects like the Hoover Dam started in1931 and the Eisenhower highway network launched in1956. 

Alex Al Yazouri
par Alex Al Yazouri , General Manager , Al Mushref Cooperative Society

I agree, it's on Colorado River,30 miles southeast of Las Vegas on the Nevada/Arizona border.

Muhammad Shakeel
par Muhammad Shakeel , CAD Design Manager , M/S zeeruk Intl.

Thanks for invitation Mr. Yaqoob. I agree with this statement and support to Answers of the Experts.

A Gantt chart is a timeline view that makes it easy to see how a project is tracking. You can visualize project tasks and see how they relate to each other as projects progress over time.

Mohammed Shaban
par Mohammed Shaban , Small Business trainer , UNDP &Reda IT& Managenet C

I agree with experts, that Gantt chart is easy and suitable tool for a sampel proect ,but

for scheduling and tracking a project with handeds of activities we need more then Gantt or bar chart we have to use another tool likes network or CPM thanks

More Questions Like This

Avez-vous besoin d'aide pour créer un CV ayant les mots-clés recherchés par les employeurs?