Promise Eleazu
par Promise Eleazu , Site Manager , E2o creazioni NIGERIA limited

Is the value or condition against which all future work-scope and measurements will be compared and used as a point of reference.3 types in Project Management: -Schedule Baseline. -Cost Baseline. -Scope Baseline.3 Benefits are; -Envisages the success of a project -Tracks the progress of tasks, cost, and time. -Controls causes of rework.

Muhammad samran
par Muhammad samran , Junior Officer/Project Coordinator , Pakistan Stell Mill

 

A baseline is used to perform analysis to find current performance against to the expected level for a specific activity in established time-phase.

Project baseline compare the actual work with the planned work.

Alex Al Yazouri
par Alex Al Yazouri , General Manager , Al Mushref Cooperative Society

A baseline is a set of stored values. Usually these will be:

  • Original Scheduled Start and Finish Dates.
  • Planned Effort (may be expressed in hours).
  • Planned or Budgeted Cost.
  • Planned or Budgeted Revenue.

The main benefits of having a project baseline are:

  • Ability to assess performance.
  • Earned Value calculation.
  • Improved future estimating accuracy.

SHIVAJI DHUMALE
par SHIVAJI DHUMALE , MEP Project manager , ETA

In Project management, Baseline refers to the accepted and approved plans & their related documents. Project baselines are, generally, approved by project management team and those are used to measure and control of project activities.

When you are managing a project, you establish "baseline" cost estimates and schedules based on beginning assumptions. The thing is, at the very beginning of a project there is a lot of uncertainty, so it's really only a ballpark estimate at that point. As things develop, you start to remove some of the uncertainty. Also, situations change - the concept for the project might change, resource availability might change, costs might go up, etc.

Wolf Klaas Kinsbergen
par Wolf Klaas Kinsbergen , Managing Director, Designer , ingenieursbureau KB International NV

Compare the plan with the actual standing

Mohammed Lamloom
par Mohammed Lamloom , Design & Development Director , SIGMAC Real Estate Company

a basis against which to measure the project performance

monitor and control overall the project performance

measure the actual progress during the project life

aamir mumtaz
par aamir mumtaz , HR & Admin officer , Human Appeal International Pakistan

In development sector, Project baselining helps you in:

1. Need assessments

2. Feasibility study

3. Identifying pre-conditions

4. Developing project proposals & concept notes

 

Creating a first overall plan for Implementation wherein all deliverables are agreed . Setting up a baseline means that from here the Implementation  shall be monitored as per that plan.