What factors do we need into consideration while drafting the cable routing plan?

user-image
Question ajoutée par Ayaz Butt , Electrical Engineer , Pioneer Engineering Consultancy
Date de publication: 2014/09/22
Mohamed Elnakib
par Mohamed Elnakib , Instrumentation and control systems engineer -Al shabab power project Phase II , Pgesco

to cut things short you should mainly consider the following :

1-Cable grouping factor (how many cables in the same duct and the heat they produce due to the passing current )

2-the duct filling percentage to allow the cables to be pulled ,

3-the different service levels ( a cable carrying high current shouldn't be passing in the same duct or on the same cable tray level with a cable carrying instrumentation signals or a control cable to avoid induction of currents that could lead to major problems .

4-the binding ratio of the cables and the cable thickness .