The Most Critical Part of The Project and The Most Critical Need on the Project

Planning Network Working ( real and rational ) with consideration schedule : material, manpower and tools / equipment and over all. Engineering ( drawing planning, drawing implementation and drawing actual implementation ), construction ( preparation till completion )

user-image
Question added by ILHAM DJAMALUDDIN , Structural Engineer , PT. ANDALAN, Jakarta, Indonesia
Date Posted: 2014/04/17

The most critical part of my project is design and modification of compressed air car engine.