Arrange your prorities at site quality, cost or time for execution at site?

user-image
Question added by Mohamed Sulaiman , Site Project Manager , Al tabarak for Engineering & Contracting company
Date Posted: 2013/12/31
Bijoy  Baby
by Bijoy Baby , Project Manager , Alumayer India Pvt. Ltd.

Quality in the sense of a project is the out come of its maximum perfection in a specified timeline...means...less error will produce no rework, no extra time, no wastage, no extra coast..that is the beauty of a controlled project. The error is depends of the way you done it. 

Ahmed Mamdouh Kamal
by Ahmed Mamdouh Kamal , Founder & Product Designer , AMZ Guitars

The triple constriant of a project is dependent on the type of product/service we provide. So, there is no general answer to this question.

Sohaib Ashraf
by Sohaib Ashraf , Resident Engineer , Meinhardt Pakistan pvt LTD

1. Time

2. Quality

3. Cost

Abrar Hussain
by Abrar Hussain , Contract Manager , Sahara Tamiratt

1. time

2.quality.

3.cost

Ali Abadi Rasool
by Ali Abadi Rasool , Team leader , Ashour co.

a) Quality

b) Time

c) Cost

Ramesh Venkat
by Ramesh Venkat , Chief Executive Officer , Samridhi Realty Group

a) quality

b) cost

c))time

d0 Branding of company

The primary priorities at site for execution are scope, time, quality and cost.