What is meaning by project baseline?

user-image
Question added by Eng. Adel Khalaf (PMP Certified) , U.A.E
Date Posted: 2013/12/16
Ahmad Alhassan
by Ahmad Alhassan , Chief Information Security Officer , Fintech

The baseline is the original range, total cost and schedule of a project.

It is used to measure the amount of deviation of performance from the original plan. Before, the execution of the project, the baseline must be properly defined and documented.