Start networking and exchanging professional insights

Register now or log in to join your professional community.

Follow

A project has high risks. best option is (a) replan (b) increase budget by adding contingencies (c) accept the risks (d) drop the project.

user-image
Question added by Ramendra Sunder Sinha PMP , DGM Planning , Gaur Sons Limited
Date Posted: 2013/10/19
Khaled Alhassoun
by Khaled Alhassoun , Consulting Management - Senior manager , Price waterhouse Coopers

Option "B",

A) replan may or may not mitigate the risk ,

C) can't accept high risk

last option is to drop the project.

Ahmad Salameh
by Ahmad Salameh , Deputy Resident Engineer- Technical and Quality Assurance Manager , Arabtech Jardaneh

Replaning should be first

Abhishek Kumar
by Abhishek Kumar , Assistant Planning Manager , Larsen & Toubro Limited

Option "B", because replan may or may not mitigate the level of risk , where else adding contingencies to the increase budget can help in reducing the level of risk even if plan differ from actual.

 

Abdullah Al Ayoubi
by Abdullah Al Ayoubi , مدير عام الادارة الفنية بالقوات البحرية , القوات البحرية الملكية السعودية

B

dhileep kazhungil
by dhileep kazhungil , Sales Executive , Al Rizq Advertising LLC

B is the best option

a, because by replanning we can minimise the risk

All of options are acceptable. But in order to choose the best solution is to analyze the countermeasures costs, if deploying them is more expansive compare with the project risks, for this case it is better to accept the risk and do not any thing. While, if deploying the countermeasures costs equal to or less than the project risks, for this case you need to mitigate the risk by deploying these countermeasures.

Sunil Chandra Mohan
by Sunil Chandra Mohan , Assistant Manager-R&D , Kerala Agro Machinery Corporation Ltd.(Kerala State Govt. undertaking)

I would say accept the risks and scrutinize and plan for risk mitigation.

Wayne Greiner (MBIFM)
by Wayne Greiner (MBIFM) , Engineering/ Facilities Manager. , Hertfordshire Constabulary

(B)

 

عبد الحكيم أحمد سعيد الصباري
by عبد الحكيم أحمد سعيد الصباري , المدير التنفيذي , دار الخبراء لتطوير الأعمال

a

More Questions Like This

Do you need help in adding the right keywords to your CV? Let our CV writing experts help you.