Start networking and exchanging professional insights

Register now or log in to join your professional community.

Follow

In the maintenance system what is the use of the work control office ?

user-image
Question added by hassan qutb , Facility&Engineering Manager PMP. , مقاولات خاصه
Date Posted: 2013/10/15
Ahmed Fathy
by Ahmed Fathy , Business Development Director - MBA - PMP - EBRD International advisor , International Casting & Modern Industries

it is an office witch have the output devices like screens like digital counters & etc. to explain the reading of temp., vibration, pressurers, levels of liquids and all things we need to follow or to measure.

some big factores use this system to controll, watching and record every thing and its a big advantage.

Wayne Greiner (MBIFM)
by Wayne Greiner (MBIFM) , Engineering/ Facilities Manager. , Hertfordshire Constabulary

In my expereince it refers to the use of a CAFM system (Computer Aided Faciltiues Management) system which generally holds all asset information like what type of asset it is when it was installled how often it should have maitenance and service done to it and many other information records etc, etc.

Waleed Zaki
by Waleed Zaki , Help Desk Operator , Contarack F.M

Ensure the efficiency of work and workers' control in order to realize what is the amount of ability to work and maintain the safety of workers before workplace

More Questions Like This

Do you need help in adding the right keywords to your CV? Let our CV writing experts help you.