Start networking and exchanging professional insights

Register now or log in to join your professional community.

Follow

What is the maximum allowed concrete temperature during pouring on site?

user-image
Question added by Mohamed Refaat , Projects Engineer , ABDULLAH ABDULGHANI & BROS. CO
Date Posted: 2016/10/19
waleed Emad Al-deen Fahmy Al-ghandour
by waleed Emad Al-deen Fahmy Al-ghandour , Senior Accountant , Combined Group Contracting Co.

37 degree

recommended to use ice in concrete mix

marwan Abuhasan
by marwan Abuhasan , design for fit out company using revit and autocad , Asl al ibdaa technical services

It is recommended that concrete should not be poured at tempratures exceeding 35-37 degrees Celsius but the optimal tmperature for pouring concrete should between 24 to 32 degrees Celsius .

Sherwin Atinaja
by Sherwin Atinaja , Field Engineer, QC Painting Inspector,In-Charge Rebar Fabrication & Test Pack Coordinator , Al Rushaid Construction Co.,Ltd.

35-37 degrees Celcius allowed concrete temperature.

Manoj Balakrishnan
by Manoj Balakrishnan , Senior QAQC Engineer , NMDC

In UAE the maximum allowable concrete temperature is 30C.

37 DEGREE IN HOT SITE AND MORE TEMPERATURE MIX ICE

Tahir Naveed
by Tahir Naveed , senior Surveyor , Building Engineering

37 degree celsius is maximum temperature is allowed for concrete during pouring on site

 

Omer Agabna
by Omer Agabna , Construction Engineer , Dal Disigne and construction

37 degree, in hot weather its recommended to use ice in concrete mix and water the shuttering before casting    

Praween Shah
by Praween Shah , Site Engineer Supervisor , Subedi Nirman Sewa Pvt. Ltd

The simple truth of the matter is that concrete placed and cured at a moderate temperature (60° to 80° F) will outperform +90° F concrete in strength and durability. If you are looking for superior concrete, control the temperature.

Mohamed Refaat
by Mohamed Refaat , Projects Engineer , ABDULLAH ABDULGHANI & BROS. CO

 I mean the concrete temperature itself , not the weather 

Tahir Mehmood
by Tahir Mehmood , Construction Engineer Road , Al Ayuni investment and contracting co

in UAE concret temperature should be in between 24 Degrees Celsius to 32 Degrees Celsius if not then concret will be rejected 

Hemdan Abdallah Elshaer
by Hemdan Abdallah Elshaer , Senior QC Enginner , EDECS

normal it's 28 and reaches max. to 37 after that  we can use ICe in concrete mix and spread the shuttering formwork with water prior to casting 

More Questions Like This

Do you need help in adding the right keywords to your CV? Let our CV writing experts help you.