How can I do a pressure test to water net work?

user-image
Question added by Yahia Mohamed Suliman Ahmed , Project Manager , Brouj construction CO
Date Posted: 2016/10/13
mahmood kheder
by mahmood kheder , مدير القسم الفني وحاصل على درجة الاستشاري من نقابة المهندسين , alliba

By blocked all the ends and pourching the air and inlet water under presure at least 12 - 14 bar and searching for the leakage if there.

Basim Natour
by Basim Natour , General Manager , sulaiman alrajhi construction company

Close the network and use the pump to pressurise the network to at least 6 bars for 24 hrs to make sure the there is no leakage.