mahmood kheder
by mahmood kheder , مدير القسم الفني وحاصل على درجة الاستشاري من نقابة المهندسين , alliba

Thank you for your invitation.

This answer was adapted from web becuase this job can work with client & contractor .

The Responsibility:

  • prepare tender and contract documents, including bills of quantities with the architect and/or the client;
  • undertake cost analysis for repair and maintenance project work;
  • assist in establishing a client's requirements and undertake feasibility studies;
  • perform risk, value management and cost control;
  • advise on a procurement strategy;
  • identify, analyse and develop responses to commercial risks;
  • prepare and analyse costings for tenders;
  • allocate work to subcontractors;
  • provide advice on contractual claims;
  • analyse outcomes and write detailed progress reports;
  • value completed work and arrange payments;
  • maintain awareness of the different building contracts in current use;
  • understand the implications of health and safety regulations.

Basim Natour
by Basim Natour , General Manager , sulaiman alrajhi construction company

Quantity surveyors perform a wide variety of tasks throughout the complete life cycle of a construction project.

Typical responsibilities include:

  • seeking funding sources and submitting bids
  • carrying out feasibility studies
  • preparing plans, contracts, budgets, bills of quantities and other documentation
  • performing risk analysis evaluations
  • cost control
  • writing reports
  • preparing and submitting final accounts
  • making valuations
  • arranging payments to suppliers and contractors
  • providing advice and forecasts about costs
  • supervising staff.

Md Fazlur Rahman
by Md Fazlur Rahman , Procurement Specialist , Engineering and Planning Consultants Ltd

1.       To prepare bill of quantities (BOQ)

2.       To estimate the quantity of raw materials required to produce the specified amount of different items of the BOQ. 

3.       In some cases, quantity surveyor is also required to produce the estimated cost per unit of different items of BOQ

Abdul Rehman
by Abdul Rehman , Electrical Engineer , Tamdeed Projects

Thank you for the invitation. Quantity surveyor responsibilities are as follows: 

- Prepare bill of quantities (BOQ) and other documentations

- Prepare and analyze costing for tenders

- cost control

- Feasibility study

Nader Ali
by Nader Ali , Technical office manager , AlSafwa Contracting

I agree with the previous answer in addition to prepare and sending inquiries include the specs and quantities to suppliers and subcontractors for BOQ items and receive quotations which he use to make a comparison between them and choose the best.

Krishna   KHASANIS  PMP
by Krishna KHASANIS PMP , Project Manager-Electrical , Larsen & Toubro Ltd, P T & D (International)

Thanks for the invite.

Quantity Surveyor is a general term, depending on the type of project a QS responsibilities may vary but a QS is expected to act upon various tasks throught the project life cycle and those tasks are well covered by experts in the above postings. 

DR MD ANWAR HOSSAIN
by DR MD ANWAR HOSSAIN , Moderator , bayt.com

Thank you for your invitation,

The Responsibilities of a Quantity Surveyor Is- As the construction industry grows, more and more skilled roles are becoming available, especially in positions like quantity surveyor. Quantity surveyors are responsible for the cost of any building project - from initial estimates, right through to the final acquisition of materials. Surveying jobs and their associated roles are varied - but focussed on providing clients value for money while adhering to the strict regulations which govern every aspect of the construction industry.

The day to day responsibilities of include roles inside the office, on the construction site - or in meetings with clients and other project personnel. While the very nature of construction work ensures no two projects are ever the same, a typical work day might involve:

  • preparation of contracts, including details regarding quantities of required  materials
  • on-going cost analysis of maintenance and repair work
  • feasibility studies of client requests
  • analysing completed work and arranging payment to contractors
  • allocating upcoming work to contractors
  • site visits, assessments and projections for future work

Quantity surveyors may choose to specialize in a specific area of the construction industry - and focus on areas like property taxation, costing advice, maintenance of existing buildings and application to funding sources.

GERALINO PANTOJA CAUDILLA
by GERALINO PANTOJA CAUDILLA , HSE Engineer , EL SEIF Engineering Contracting Company Ltd.

Being in HSE Job Works and being a Graduated of Civil Engineering, it is great advantage that I can make a Material Quantity Take-off or Quantity Estimating of Materials, like: the Materials or Logistic needed in the Safety works in General.

Muhammad Qasim
by Muhammad Qasim , Senior Electrical Engineer , Energy Associates (SMC Ptv.) Ltd.

Sorry its not my field. Thanks

Ihab Zaki
by Ihab Zaki , Chief Technology Officer (Cto) , EGID

Agree with Mr. Mohamed Khedr

Sadeq Al-Abbad
by Sadeq Al-Abbad , Service Specialist , Halliburton Energy Services Inc

l agree with all above answers