Will there be a cost reduction in energy billing by moving the metering point from the MV downstream reticulation to the HV side before transformer?

user-image
Question added by Cornelius Niemandt , Chief Engineer - Pre Opening Royal Senchi Hotel , AMSCO UNDP
Date Posted: 2016/09/27
IKECHUKWU EVEREST AKWUIWU
by IKECHUKWU EVEREST AKWUIWU , PRINCIPAL MANAGER LEVEL 14 , POWER HOLDING COMPANY OF NIGERIA

FROM CONSUMER POINT OF VIEW, THERE WILL BE NO COST REDUCTION BECAUSE THE TRANSFORMER LOSSES WILL ADD UP TO THE ENERGY CONSUMPTION