Start networking and exchanging professional insights

Register now or log in to join your professional community.

Follow

How to make lifting plan for tandem lifting ?

user-image
Question added by Irfan Abdullah , HSE Advisor , Ferrovial agroman
Date Posted: 2016/02/18
Vishand Bhajan
by Vishand Bhajan , Health And Safety Superintendent , Zijin mining

 

  • The competent person planning the lift

  • Calculations

  • Equipment required

  • Personnel required and their particular roles

  • Step-by-step instructions

  • Communication methods to be used

  • Contingency and rescue plans

 

Aboubakr Mohamed GradIOSH
by Aboubakr Mohamed GradIOSH , Field Compliance Coordinator (Environmental Protection, Radiation Protection, Occupational Health) , Saudi Aramco

Generally to make a proper lifting plan, you will have to take into consideration the following points :

1- Conducting a proper site survey ( area of lifting ).

2- Risk Assessment Shall be done.

3- Determining the classification of the lifting type, weather it's a routine or non routine lifting.

4- Planing and carrying out of routine and non routine lifting.

5- Assigning the responsibilities of competent persons (operators, riggers, and signalman ).

6- proper description of the loads.

7- Cranes selection Criteria. 

8- Crane sitting and lifting study.

9- Ground and surrounding conditions.

Those are the most important items shall be taken into consideration in, and within doing the lifting.

Maverick B
by Maverick B , CAD Sup. Heavy Lift , Freelance

Crane Lifting (Vertical Installation) - Tandem Lifting of 2 Cranes, where Crane 1 will lift on its Main Lifting Points then Crane 2 will lift from the Load Tail Point. Where at most, equipment being lifted is at horizontal position, 2 Cranes will be Upending the load to Vertical Position.   

Crane Lifting (Horizontal Installation) - Tandem Lifting of 2 Cranes by lifting the load @ 2 lifting points and                                                          inserting the trailers under for loading. 

                                                      - Tandem Lifting of 2 Cranes by lifting @ 2 lifting points and crane

                                                        will boom down towards load installation point.

 

"These are the most common tandem lift works"

 

Rejoy Varghese
by Rejoy Varghese , CHIEF SHE MANAGER , IRCON INTERNATIONAL LIMITED

To make a lift plan for tandem lifting

First thing is to consider is the area of lifting ie, positioning and selection of crane, near by utility services and buildings, ground conditions, Wind speed etc..

Secondly consider the load which is going to be lifted ie the weight, complexity, irregularities etc...

Thirdly consideration should be given of the lifting tools and tackles, ie the third party certificate for lifting, slings and shackles, wire ropes etc..

and finally we need to consider the competency of the lifting team Effective communication must be established and maintained between all people involved in a tandem lift.

 

Joselito Maglaqui
by Joselito Maglaqui , HSSE Systems & Assurance Engineer - Currently looking for a job , Shell Philippines / Brunel - Finished contract

The lifting plan is to be done by the specialist lifting company, you cannot just make a plan. The lift to becomes successful requires by law to be professionally planned. 

Mohamed Ismail
by Mohamed Ismail , SAFETY OFFICER , LOGOS ENGG LTD IN CHENNAI PETROLEUM CORPORATION LTD

LIFTING INVOLVING TWO OR MORE CRANES ARE COMPLEX OPERATION REQUIRES CONSIDERABLE SKILLS AND PLANNING..AND MULTIPLE CRANES MUST BE PLANNED AND CARRY OUT UNDER A COMPETENT PERSON SUPERVISION.AND COMPETENT PERSON MUST DEVELOP AND COMMUNICATE A DETAILED LIFT PLAN..IT SHOULD CONTAIN CRANE POSITION,RIGGING,LIFT SEQUENCES,LOAD MOVEMENT,BOOM CLEARANCE,RATED CAPACITY OF EACH CRANE

More Questions Like This

Do you need help in adding the right keywords to your CV? Let our CV writing experts help you.