Start networking and exchanging professional insights

Register now or log in to join your professional community.

Follow

If I have already fixed a shuttering for 7ft instead of 12ft. What should be the best solution for columns concreting?

Actually we have fix shuttering for loft slab on7ft. Afetr the final decision of our client we have cancelled loft slab. Now should we pour half columns and then completed the whole columns upto heightft or we have to pour columns concrete at once?

user-image
Question added by Iftikhar Hussain , Project Civil Engineer , Strong Worth LTD. Business Development Associate
Date Posted: 2015/10/14
ismail ünlükara
by ismail ünlükara , Construction Manager , Sys Construction

It is better to place concrete of a column 12 ft height at once, but I am limited with 7 ft shuttering as source, I make 2nd placement by prociding:

--Rebar design no change

--1st and 2nd concrete placement no offset

--Interface clean and rough

Keith Gregory Wright
by Keith Gregory Wright , Program Director , DynCorp International

Construction methodology is a function of resources and limitations with pouring columns. To my mind i would pour columns to full height, taking care to place and compact concrete properly and not over loading forms, i like to limit my placement rate to 1m head per hour.

hatem labib
by hatem labib , Quality control manager , MISER consultant

The two solution are correct as a contractor you can choose the solution which save the money as consultant i will choose the second.

More Questions Like This

Do you need help in adding the right keywords to your CV? Let our CV writing experts help you.