At which stage, does a typical project has maximum cost? 1-Initial stage 2-Middle stage 3-Final stage 4-Cost is same at all stages.

user-image
Question added by Muhammad Umar , Sales & Product Design Engineer , MAIRWAIS GOLDSMITHERY LLC
Date Posted: 2015/08/05
Qamar Saeed
by Qamar Saeed , Assistant Manager , Ufone (Etislat)

1. It is easy to make changes to project goals and approach at the initial stage. Stake holders have maximum influence at this stage.