Please comment with clauses of IS code/ any relevant if you have.
The difference between the two is in the application. A development length is the amount of rebar length that is needed to be embedded or projected into concrete to create a desired bond strength between the two materials. The lap length is the length two rebar pieces must overlap and be tied together to create a bond as if there was no break and the run is "continuous".