Start networking and exchanging professional insights

Register now or log in to join your professional community.

Follow

Does change in scope affect quality in the field of construction project management?

user-image
Question added by Rahaf Masri , Account Sales Director , MT3 Digital
Date Posted: 2015/02/12
Godwin Etim
by Godwin Etim , Bernard Ojeifo Longe V First Bank of Nigeria Plc

A change in scope will definitely affect quality in that if resiources have been allocated to cater for the original scope, a change or expansion in the scope would mean additional resource allocation in order to meet up with the delivery time frame of the project. If extra resources are unavailable, quality would be compromised in order to fit the existing resources to the changed project scope. It would also mean that more pressure would be put on activities on the critical path.

Ahad Nazir
by Ahad Nazir , Manager (Projects) , Dimensions Construction Company

I think scope affects the quality most in construction industry then in the others because of the very high cost of re-work. This is part of the configuration management framework defined by most organizations by virtue of which changing one of the4 constraints (Scope, Quality, Cost and Schedule) will affect the others in a good or bad way. But it also depends on where you are in the Project lifecycle. if you are still in the concept or design phase, it might be less damaging to the quality of the final product whereas the later you get in the lifecycle more drastic the affect may be to the outcome.

Alex Al Yazouri
by Alex Al Yazouri , General Manager , Al Mushref Cooperative Society

The famous triangle of scope, cost and schedule has quality in the heart of the triangle.

We have to change or adjust the contract and the specifications to change the quality.

More Questions Like This

Do you need help in adding the right keywords to your CV? Let our CV writing experts help you.