Start networking and exchanging professional insights

Register now or log in to join your professional community.

Follow

What is the formula for concrete cube compressive test by Accelerated Curing Tank (ACT) method?

user-image
Question added by Omair Abduljaleel Ali Al-Quliey , مدير لمكتب المهندسين اليمنيين , مكتبي مكتب المهندسين اليمنيين
Date Posted: 2015/01/03
جعفر هندي زين السقاف
by جعفر هندي زين السقاف , مهندس أستشاري , مشاريع اﻻشغال العامة

M20-for7 days it should be67% and for28 days it should be100%...formula for cube testing: ex: m20 size of cube surface area is15*15 =225/10=22.5 for m207days20 *22.5 *67% =301.5 kn.28 days20 *22.5 =450 kn.

Alex Al Yazouri
by Alex Al Yazouri , General Manager , Al Mushref Cooperative Society

I agree with Eng. Jaafar.

Tarek Alahmar
by Tarek Alahmar , Project Manager , Ertas Mimarlik

I agree with Mr Jaafer ........thank you for your question

hatem labib
by hatem labib , Quality control manager , MISER consultant

Agree with Mr Gaafer

abdul Rahman Salihi
by abdul Rahman Salihi , Chief Civil Engineer , State Company of Implementing Major Elect . power generating projects ects

The question as i understand regards the gaining of the real28 gays Compressive strength using the formule of ACT for cub test, The formula is : R28 =8.09 +1.64 Ra Where. Ra. Is the result gained From the ACT Cube test, in newtons / mm2 and R28 is the predictrd28 days compresive strngth for the mix in the question. As per ( IS:), I hope i have answered the question. Abdulrahman Salihi,

Consultant Civil Engineer

More Questions Like This

Do you need help in adding the right keywords to your CV? Let our CV writing experts help you.