من قبل hassan qutb , Facility&Engineering Manager PMP. , مقاولات خاصه

To secure my team during the feild work

Engr H. Qutb

mazen yaseen
من قبل mazen yaseen , Electrical construction Manager , TRUST ELECTRICAL CONTRACTING EST

waiting the mechanical department to finish the material approvals

bassem malaeb
من قبل bassem malaeb , chef technecien , mecanix shops

Be carefully for all works especially for electrical parts.small mistake take you away

farid briber
من قبل farid briber , Electrical Senior Technician , bank of Algeria

working under pressure . and without safety.

Mohamed Rifai
من قبل Mohamed Rifai , External Consultant , Coenergi Private Limited

Reducing cost and eliminating impact to environment are the very difficult part of electrical systems. 

When you are really good at electrical systems, then for sure nothing is difficult..

MOHAMED ELHAFEZ ALI AL-SAYED AL-HAFEZ
من قبل MOHAMED ELHAFEZ ALI AL-SAYED AL-HAFEZ , مدير قسم الكهرباء , Alhasoor Mining

 I think the patience to faults dipsticks

Adnan Yasin
من قبل Adnan Yasin , Junior Engineer Electrical , Nishat Chunian Power Limited (NCPL)

i want to learn PLC.

 

Takwim Toyib
من قبل Takwim Toyib , Chief Engineer , PT. Menara Thamrin

Every science is dificult if we are not mastering it. The key is kowledge. So no word late to learn and learn and practice. The experience is the best teacher. Good luck for your sir.

Hani Albreem
من قبل Hani Albreem , Chief MEP Projects Engineer , Mohammed Bin Rashid Housing Est.

Depending on the type pf work & projects and whether you are a consultant or contractor,

A-    If you are a contractor: 

B-    Waiting to get all real demission, electrical load for all Mechanical, Plumping & Electrical Equipment material to start design final shop drawing.

C-    Waiting to get final approval from the consultant & local authorities

D-    Testing & commissioning  (Hoping while starting that  (No Errors or no missing cable , conducting block , wiring not pulled inside )

B-    If you are a Consulting  : 

1-     Waiting to receive all , electrical  shop drawing for all Mechanical, Plumping & Electrical Equipment material  from the contracting  to provide reject/approve with comments status

2-     Facing the client and discussion with him his requirements

 

3-     Handing over the all documents of whole projects at end to the client 

Stanley Andrada
من قبل Stanley Andrada , QA/QC Electrical Engineer , ARP COMMISSIONING

The difficult thing is that you are electrocuted. 