ابدأ بالتواصل مع الأشخاص وتبادل معارفك المهنية

أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.

متابعة

In term of "Plan Risk Response" what is the difference between reduce threat and and fallback threats?

user-image
تم إضافة السؤال من قبل Wasim Khalil Mustafa Ali PMP® , Consultant , Malomatia
تاريخ النشر: 2014/02/04
Raafat Sallam
من قبل Raafat Sallam , Organizational Development and Training Consultant , Training Centers, Marketing Organizations.

Reduce threat is a preventive action, but fallback threat is corrective action.

Ahamed Shareef
من قبل Ahamed Shareef , Divisional Head - Quality Assurance , Apollo Tyres Ltd

I agree with Raafat. Well defined statement.

Abdullah Alsubaie
من قبل Abdullah Alsubaie , Project Manager , National Water Company

It is seem complicated but I think must each Risk management plan has Risk Response plan to deal with any potential threat beside that any success in the application of risk response through all project phases would caused  fallback threats.

زهير موسى رشيد بكر
من قبل زهير موسى رشيد بكر , استشاري علاقات عامة , خاص

Please answer the model you

Bandar Aleid
من قبل Bandar Aleid , Program Manager (PMP Certified) , Rheinmetall Arabia Simulation and Training

You can think of reduce threat as Plan 'A'. The plan that you will follow when a risk occurs

fallback threat as plan 'B'. The plan that you will follow, when plan A did not work

When we talk about reduce threat; we generally means that we have now resilience over the issue or place enough control to deal   by using different models. we have cover the impact of the undesirable effect. 

There is no such term as  Fallback Threat.  Threat is a Threat. or you mean residual risk left behind after implementing controls.

المزيد من الأسئلة المماثلة

هل تحتاج لمساعدة في كتابة سيرة ذاتية تحتوي على الكلمات الدلالية التي يبحث عنها أصحاب العمل؟