ابدأ بالتواصل مع الأشخاص وتبادل معارفك المهنية

أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.

متابعة

A contingency plan is: ?

A. A planned response that defines the steps to be taken if an identified risk event should occur. B. A workaround C. A reserve used to allow for future situations which may be planned for only in part. D. a and c

user-image
تم إضافة السؤال من قبل Zakir Muhammed , Contract Administrator , DS Contracting Co.
تاريخ النشر: 2019/01/05
Obaid ur Rehman
من قبل Obaid ur Rehman , HR Executive , Al Bahr Al Arabi Marine Engineering Services

i would like to go with option A

Generally it is call contingency plan to be excuited when identified risks showed up , this contingency plan & its steps is prepared based on pre-identifiecation of risk at planning stages & prepared risk register.

so right answer is A

saleem abrar
من قبل saleem abrar , Recruitment Coordinator (Client Management & Recruitment) , HABSONS JOBUPS LIMITED

A contingency plan is a plan devised for an outcome other than in the usual (expected) plan. It is often used for risk management for an exceptional risk that, though unlikely, would have catastrophic consequences.

Its option D.

Saiyid Maududi-Oracle Applications Consultant
من قبل Saiyid Maududi-Oracle Applications Consultant , Entrerprise Architect , US Technomatrix, Inc

Hello Team,

Many businesses do not even consider a contingency plan or realize the option exists and is a sound practice. Creating a plan is most often overlooked or forgotten when times are good and business is booming. Unfortunately, it does not take much to completely turn things around. One technical mishap that crashes a server, a missed delivery or a major project that goes unpaid can turn a business upside down in a hurry.

contingency plan is a plan devised for an outcome other than in the usual (expected) plan.

It is often used for risk management for an exceptional risk that, though unlikely, would have catastrophic consequences. Contingency plans are often devised by governments or businesses. For example, suppose many employees of a company are traveling together on an aircraft which crashes, killing all aboard. The company could be severely strained or even ruined by such a loss.

A pre defined course of action(s) to be taken in case of any emergency.

Mohammed Qaisar I PMP I MCIPS I MBA
من قبل Mohammed Qaisar I PMP I MCIPS I MBA , Group Procurement Manager (Civil) , Al Ghurair Construction LLC

Contingency reserves are also called time reserve, buffer or management reserve. The contingency reserves are for the identified schedule risk remaining after the risk response process. These reserves are normally included in schedule baselines. The contingency reserves are the additional fund kept aside in order to utilize at the time of occurance of unforseen risk that would impact the project. 

Muhammad Farooq
من قبل Muhammad Farooq , QA-QC MANAGER , AL Bawani contracting co.

I think option A -------------------------

Zakir Muhammed
من قبل Zakir Muhammed , Contract Administrator , DS Contracting Co.

A planned response that defines the steps to be taken if an identified risk event should occur.

هل تحتاج لمساعدة في كتابة سيرة ذاتية تحتوي على الكلمات الدلالية التي يبحث عنها أصحاب العمل؟