What are the precautions during hot weather concreting,in the two cases mix production and construction?

user-image
تم إضافة السؤال من قبل Amjad Alomari , TECHNICAL DEPARTMENT MANAGER , Civil and Electromechincal Construction Co.(CEMCCO)
تاريخ النشر: 2016/11/27
Muhammad Farooq
من قبل Muhammad Farooq , QA-QC MANAGER , AL Bawani contracting co.

  • Ambient temp shall not be exceeded set by the relevant countries. In KSA 40 degree and in Canada 27 degree centigrade
  • Concrete temp in KSA shall not be exceeded by 32 degree 
  • Night pour is preferable
  • Cool down coarse and fine aggregate by shading and sprinkling
  • Use of chill water and ice if does not disturb water content (W/C ratio)
  • Better if concrete batch plant set up at site OR Time between Batch time and pouring time shall need to be kept minimize
  • Use of water reducing agent
  • Retarded admixture but with caution because it may reduce concrete compressive strength.
  • Better to make workable concrete  Slightly higher slump but shall not be crossed 150mm limit with superplasticizer ( Normal Concrete)
  • quickly placed the fresh concrete OR avoid delay in pouring etc.

Eduardo Pinza
من قبل Eduardo Pinza , Safety Engineer , Ali & Sons Contracting Co. LLC

as per to work per procedure follow the specific Safety plan & Risk Assessment. use specific P.P.E. as required to the work scope.

المزيد من الأسئلة المماثلة

هل تحتاج لمساعدة في كتابة سيرة ذاتية تحتوي على الكلمات الدلالية التي يبحث عنها أصحاب العمل؟