ابدأ بالتواصل مع الأشخاص وتبادل معارفك المهنية

أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.

متابعة

Could you list advantages and disadvantages between EPC and EPCM ?

user-image
تم إضافة السؤال من قبل Abdul Hamid BSc Eng MRICS C Eng , Lead Senior Contracts Engineer , Abu Dhabi Company for Onshore Petroleum Operations (ADCO)
تاريخ النشر: 2016/11/19
Sadiq Dandu
من قبل Sadiq Dandu , Senior Construction Engineer , Amec Foster Wheeler

EPCM model the contractor does no building or construction; rather they develop the design and manage the construction process on the owner's behalf FOR EXAMPLE:FLOUR,PETROFAC,FOSTERWHEELER

EPC (Engineering, Procurement and Construction): means the company is contracted to provide engineering, procurement and construction services by the owner FOR EXAMPLE:DAELIM,TR,SK,JGC

Hafez Jardaneh
من قبل Hafez Jardaneh , General Manager Operations , Masar Petroleum, KSA

The key difference is that under an EPCM contract, other parties construct the project – the EPCM contractor is not the builder/constructor.

EPC is much higher Risk than EPCM.

EPCM is limited to construction management and most of the time linked to Mna/Hr rate were EPC is lump sum.

المزيد من الأسئلة المماثلة

هل تحتاج لمساعدة في كتابة سيرة ذاتية تحتوي على الكلمات الدلالية التي يبحث عنها أصحاب العمل؟