ابدأ بالتواصل مع الأشخاص وتبادل معارفك المهنية

أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.

متابعة

In your opinion, what are the main reasons for project delays?

user-image
تم إضافة السؤال من قبل Gamal Alnomiry , Projects Management Senior Advisor , Kuwait National Petroleum Company (KNPC)
تاريخ النشر: 2016/03/14
Tamara Stanojevic
من قبل Tamara Stanojevic , Business Support Specialist , Robert Bosch doo

Bad planning (which is not taking all important aspects into consideration), insufficient collaboration

Lack of full understanding of the project objectives from everyone in the team, which means not everyone is on the same page. This creates weak links in the team and leads to project delays.

Atif Awan
من قبل Atif Awan , Supervisor , Delta Telecommunication Pvt

It's depend on different things Firstly we should know , on what type of project we are working Normally, time delay occur due to Mismanagement . Communication problem. Lazy employee. Reporting take long period. Focus on all employee.

Badshah Mayank
من قبل Badshah Mayank , Process quality , Anu industries

- Design Errors.

-Scope change.

-Inappropriate and inadequate procurement.

-Complexity of Project.

-Post execution phase.

-

 

Krishna   KHASANIS  PMP
من قبل Krishna KHASANIS PMP , Project Manager-Electrical , Larsen & Toubro Ltd, P T & D (International)

Scope not being clear and scope creep.

Availing No Objection Certificates / Clearances

Kamel Behiri
من قبل Kamel Behiri , industrial saefty , Entreprise Nationale de production tubes gaz et transformation des produits plats

the main project delay reasons - Unknown technical problems in the work plan. - Risks in the workplace and the natural hazard and individual accidents - The sociological problems of workers in their families, that these problem it have any effect on the performance of each worker.

Nahed Roshdy
من قبل Nahed Roshdy , Technical office engineer , AGC (Architecture Group Consultant)

1-lack of commitment to time schedule 

2- delay in supply the needed materials 

3-short in number of workers

Muatasim Abbas
من قبل Muatasim Abbas , General Manager , Al Manar Arabian Corp

In my opinion the following is the main reasons: lack of proper cash flow planning Ignoring the Risk management plans Trying to reduce the cost by assigning insufficient resources

sumit kumar
من قبل sumit kumar , Mechanical Engineer , super sun agro

  • According to me, the main reason for project delay is first of all the lake of worker efford because if the worker will not give their full efford no project will complete on time.
  • second think the proper maintenance of equipments if the equipments is in good condition then we can finish the any project on time 
  • At last we want to say that if the MAN POWER AND EQUIPMENT POWER is good then we can finish project on time.

Najim khot
من قبل Najim khot , junior engineer trainee , Jsw steel

As per my knowledge I would say 1) lack of team work 2) unavailability of certain part dimentions 3) unavailability of small part design 4) misunderstanding between the workers 5) electrical breakdown 6) failure in machine parts 7) lack of workers 8) issues related to the payments 9) transportation delay of some equipment 10) delay in civil work will delay the whole project 11) accident on project site 12) rework , improper work 13) lack of knowledge to the workers 14) lack of knowledge to the fabricator

irwin benjamin
من قبل irwin benjamin , ESSM Operator , PAR/RRC Goverment

Immature planning, risk assessment, understanding of challenges and deficient resources allocation.

المزيد من الأسئلة المماثلة

هل تحتاج لمساعدة في كتابة سيرة ذاتية تحتوي على الكلمات الدلالية التي يبحث عنها أصحاب العمل؟