ابدأ بالتواصل مع الأشخاص وتبادل معارفك المهنية

أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.

متابعة

How to transfer control point @ more than 20 floor building?

user-image
تم إضافة السؤال من قبل Sikandar Hayat Mohsan , Sr.Land Surveyor , HBK Contracting Company W.L.L
تاريخ النشر: 2015/11/09
Mohammed Salih Ibrahim
من قبل Mohammed Salih Ibrahim , Sr.Land Surveyor (Open For New challenge) , Directorate of Town Planning & Survey (DTPS)

20 floor is not that much high so try to use the method mentioned above with consideration the same control points (1st order) have to be used until the end of the project to avoid any accumulative error which can occurred while generate the (2nd order CP).

In case of you can't apply resection method because of surrounding buildings so you can make CP inside the building on the lower floors use(Vertical Laser Plummet) to transfer the SAME POINTS to the higher floors through small opening on each slab, so we can avoid any accumulative error.

we have to do traverse around the building area and establish proper bench marks with out any error using Bowditch rule..  simply set instrument on top of anywhere and use resection method to start ur survey. or else use core wall control survey system.

MOHAMMAD TARIQUE AZIZ
من قبل MOHAMMAD TARIQUE AZIZ , STRUCTURAL DESIGN ENGINEER , Quality Austria Central Asia Pvt. Ltd.

 A  little less complicated, can be RESECTION on each floor using your Total Station, just be sure the Ground Control Points are VERY GOOD, this is maximum3 mm Residual difference and1" angle residual difference, check all your GCP, then you can set your Control Points on top of the adjacent buildings and GO...

Mumtaz Ahmad
من قبل Mumtaz Ahmad , surveying , al-alwan est

yes this reliable method  we use many time.

Sikandar Hayat Mohsan
من قبل Sikandar Hayat Mohsan , Sr.Land Surveyor , HBK Contracting Company W.L.L

what is (core wall control survey system.)????reyaskhan sainlapathy 

Shahid Chaudhry
من قبل Shahid Chaudhry , Survey Engineer/Quantity Estimator , Archen Engineering Consultant

you have to eastblish your network by traversing around the building  and establish TBM's with out any error using Bowditch rule.

simply use resection methode on ur building to execute work

MUHAMMAD NASEEM AKHTAR MUHAMMAD AMIN
من قبل MUHAMMAD NASEEM AKHTAR MUHAMMAD AMIN , Survey supervisor , TELENOR PAKISTAN

Better way of transfer control point by laser instrument keep sleeves 10cm by 10cm every floor First mark control point at ground or first floor then by laser shift points and check after 4 floors

 

george detran
من قبل george detran , Land Surveyor , Saudi Binladen Group - ABCD

By the method of resection to at least known external control point in the ground.

 

المزيد من الأسئلة المماثلة

هل تحتاج لمساعدة في كتابة سيرة ذاتية تحتوي على الكلمات الدلالية التي يبحث عنها أصحاب العمل؟