Which of the following document is not used in Quality Management system. 1. Quality manual 2. Quality Plan 3. Guidelines 4. Drawings 5. Records

user-image
تم إضافة السؤال من قبل Anjum Jamal , QA QC Engineer , Khatib & Alami
تاريخ النشر: 2015/03/28
Arif Hussain
من قبل Arif Hussain , Accounts Payable , Pakistan

What Is TQM. (Total Quailty Management System)...........

 

1-It Provides Overall Concept that Fosters Continuous Improvement In The Organizations...

2-Its Philosophy Stress a Systematic, Integrated, Consistent Organization-Wide Perspective Involving Everyone & Every Thing......

3-It Primarily Focuses On Total Customer Satisfaction. (Internal & External Both)

 

But Drawings .An Accounting Record Maintained To Track Money Withdraw From A Business By Its Owner..

ANAND HIREMATH
من قبل ANAND HIREMATH , QA/QC MANAGER , CSCEC STEEL Construction Contracting LLC.

In the Quality management system Drawing is not the part of it.

 

All the4 documents are used in Quality Management system.. All this combined makes the Site Master file of the organisation

Tamer Hekal
من قبل Tamer Hekal , QHSE and Business Excellence Manager , BEAM Group - MODULA Manufacturing

It's according to the activity of the organization, if there's drawings, then, it will be a master file for the QMS...the guidelines also are according to how you use them (as per the Quality Manual)

Let me not be too technical about the question but If you look at the question itself. Number1 to  5 explains itself. Records is not the part of QMS although i understand that the QM system itself is used to keep all the quality records. Not unless the word changes to Painting records, welding records or load test records. Drawings is part of the QMS but not records.  

Suhas K V
من قبل Suhas K V , PROJECT ENGINEER , BLUESTAR Limited

Asalamu aleykkum I think when comparing with other documents drawings .

Kamel Naguib
من قبل Kamel Naguib , Principle Consultant & Trainer , QHSE Consulting and Training

All of what you mentioned are parts of any QMS. However, how they exist or how they used is different.

Guidelines can be governmental or corporate. Based on guidelines, you build the quality manual, based on which you build the quality plan.

Drawings is a part of the records.

Records are the means of documentation for all activities.

 

Hope this answers your question

Rimon Bestawrous
من قبل Rimon Bestawrous , Site Manager , Nicheliving Pty.

The drawings are not used in the quality management system.