ابدأ بالتواصل مع الأشخاص وتبادل معارفك المهنية

أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.

متابعة

What is the reason of using activity based costing ( ABC ) for allocate OH cost ?

user-image
تم إضافة السؤال من قبل مستخدم محذوف‎
تاريخ النشر: 2014/09/22

to allocate over heads by Activity with its own allocation base , ABC depending upon a different bases according to the activity itself like : Electricity by Sq/F , Machines Deprecation by Machine/hr , HR department by number of manpower .. so it well get more accuracy for top management decisions. 

Kenneth Arvell Auman
من قبل Kenneth Arvell Auman , Accountant , Empire Aviation Group FZCO

The reason for using activity-based costing is to allocate overhead accurately which leads to more accurate information and thus can supplement to a better and informed decision-making. Activity-based costing uses causal relationship between the cost object and cost driver. 

هل تحتاج لمساعدة في كتابة سيرة ذاتية تحتوي على الكلمات الدلالية التي يبحث عنها أصحاب العمل؟