How to change the active datum?

How to change the active datum? The default is G54. I use the entire length of the table, but I still receive alerts excessive X-axis I am trying to enter the correct value for my G58 basis points. Every time you bring in G58 to MDI and I press the Start button on the side of Positions (Positions) and Current Commands (current command) still visible is set to G54.

user-image
تم إضافة السؤال من قبل Tomasz Modrzejewski , Programmer , Company Skraw-Mech
تاريخ النشر: 2014/08/08
Tomasz Modrzejewski
من قبل Tomasz Modrzejewski , Programmer , Company Skraw-Mech

Turn off the 56 (M30 RESTORING DEFAULT FUNCTION G). Then go to MDI and enter G58, then press Cycle Start (Start cycle). G58 setting remains active until you select another operating system coordinates. Below is the exact description of setting 56: Setting 56 - M30 RESTORE DEFAULT G CODES (Setting 56 - M30 RESTORE DEFAULT FUNCTION G) This is the dwunastawne ON / OFF (ON. / OFF.). When the setting is turned off at the end of the main program ending M30 is not performed is no change in the modal functions G. When the setting is enabled, the M30 will restore the G function group to their default settings. If this setting is enabled, pressing the RESET (RESET) also resets the default values. The default setting is OFF (.).

Ahmed Mustafa
من قبل Ahmed Mustafa , Electrical Sections Manager , Coca-Cola Egypt

No more words after Tomazs answer

sheik abdullah
من قبل sheik abdullah , CNC PROGRAMMER/SETTER-CNC lathe-VMC,HMC , shall engineering

go to ---G54 work offset ---and enter desired value as you want,,, datum will shift according that..